The US Energy Department has awarded KORE Power Inc. an $850 million conditional loan commitment for the construction of an Arizona battery cell manufacturing facility.
- Facility in Buckeye, Arizona will produce an estimated 6 GWh of battery cell storage capacity annually, which could power more than 28,000 EVs a year: Energy Department
To contact the reporter on this story:
To contact the editors responsible for this story:
Alisa Parenti
© 2023 Bloomberg L.P. All rights reserved. Used with permission.
Learn more about Bloomberg Law or Log In to keep reading:
See Breaking News in Context
Bloomberg Law provides trusted coverage of current events enhanced with legal analysis.
Already a subscriber?
Log in to keep reading or access research tools and resources.